daily life (alas)
Jan. 9th, 2017 05:29 pm![[personal profile]](https://www.dreamwidth.org/img/silk/identity/user.png)
When I arrived at work it was to discover that there was a massive leak in the adjoining office. We’re lucky it’s not us, as the meaning of ‘massive’ is that water leaked all weekend through the roof, through the third floor, through the second floor and onto the ground floor. I don’t know what the ground floor looks like but the second floor had about three inches of water on it when I arrived, plus water flowing down the walls. I expect that an awful lot of electrical equipment is toast. I hope they backed up.
I had a splitting headache all day, as we operated to the sound of industrial vacuum cleaners extracting the most foul brown water from the carpets next door. How I hope they replace those carpets rather than leave them there to inevitably moulder.
I had a splitting headache all day, as we operated to the sound of industrial vacuum cleaners extracting the most foul brown water from the carpets next door. How I hope they replace those carpets rather than leave them there to inevitably moulder.